TM 5-3825-213-35
(2) Remove the main and overload spring
b. Inspection and Repair. Inspect all parts for
wear, breaks, damaged threads, or other damage. Repair
or replace defective parts as necessary.
b. Disassembly. Disassemble the carrier main and
overload spring assembly in numerical sequence as
297.
Carrier Main and Overload Spring Assembly
Reassembly and Installation
Note
Remove
and
disassemble
the
a. Reassembly. Reassemble the carrier main and
remaining carrier main and overload
overload spring assembly in reverse of numerical
spring assemblies in a similar
manner.
b. Installation. Install the carrier main and overload
296.
Carrier Main and Overload Spring Assembly
Cleaning, Inspection, and Repair
a. Cleaning. Clean all parts with an approved
cleaning solvent and dry thoroughly.
Figure 89. Carrier main and overload spring assembly, removal and installation.
214