TM 5-3825-213-35
fenders. The rubber floormat is held in place by metal
308.
Carrier Floormat Cleaning, Inspection, and
retainer strips.
Repair
307. Carrier Floormat Removal
a. Cleaning. Clean the floormat with an approved
cleaning solvent.
b. Inspection and Repair. Inspect for tears or worn
b. Remove the treadle valve and throttle valve (TM
places. Replace or repair damaged floormat.
382-213-20).
c. Remove the torqmatic transmission, plow
309. Carrier Floormat Installation
transmission, and transfer case levers and linkage (TM 5-
3825-21320).
a. Install the floormat as illustrated on figure 93.
d. Remove the control valve assembly (TM 5-
b. Install the fire extinguisher (TM 5-5825-213-20).
3825213-20).
c. Connect necessary lines, leads, and hose.
e. Tag and disconnect necessary lines, leads, and
d. Install the control valve assembly (TM 5-3825-
hoses.
213-20).
f. Remove the fire extinguisher (TM 5 3825213-2D).
g. Remove the carrier floormat as illustrated on
1
Screw, self-tapping, No. 10 x 1/2 in. (161 rqr)
9
Strip, right front
2
Strip, right rear
10
Strip, right side
3
Strip, right center
11
Mat, right side
4
Strip, right center front
12
Mat, center
5
Strip, left rear
13
Mat, left side
6
Strip, left center
14
Webbing (2 rqr)
7
Strip, left side
15
Webbing (2 rqr)
8
Strip, left front
Figure 93. Carrier floormat, removal and installation.
219