TM 5-3825-213-20
Figure 6. Hydraulic snow chute lines installation.
Section II. MOVEMENT TO A NEW WORKSITE
11. Dismantling for Movement
12. Reinstallation After Movement
a. Lift snowplow to raised position and secure
Remove safety pins and lower snowplow to plow
it with safety pins (TM 5-3825-213-10).
position (TM 5-3825-213-10).
b. Drive snow removal unit to new worksite.
18