• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 95. Plow and carrier engine fuel pump assembly, removal and installation.
Figure 97. Plow and carrier engine intake manifold, removal and installation.

Maintenance Manual Snow Removal Unit, Self-Propelled: Gasoline Driven; Rotary; Wheel Mtd; Winterized Page Navigation
  131    132    133    134    135  136  137    138    139    140    141  
img
. . . . . . .
TM 5-3825-213-20
Figure 96. Plow carrier engine priming assemblies, removal and installation.
(3) Replace or repair any damaged parts.
183. Plow and Carrier Engine Speed Governor
d.  Reassembly. Reassemble the air cleaner
Assembly
as illustrated in figure 100.
a.  Removal.
Remove the engine speed
e.  Installation.
Install the air cleaner as
governor assembly as illustrated in figure 102.
illustrated in figure 99.
Note. Remove throttle on carrier
182. Plow and Carrier Engine Fuel Lines and Fittings
engine (par. 217).
a.  Removal. Remove the fuel lines and fittings
as illustrated in figure 101.
b.  Cleaning and Inspection. Clean and inspect
b.  Cleaning and Inspection. Clean and inspect
all parts. Replace a defective engine speed governor
all parts. Replace a defective part.
assembly.
c.  Installation. Install the fuel lines and fittings
c.  Installation.
Install the engine speed
as illustrated in figure 101.
governor assembly as illustrated in figure 102.
141


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.