TM 5-3825-213-20
Figure 77. Turn signal control switch, removal and installation.
(2) Install the choke assembly on the
134. Plow Engine Choke Assembly
a. Removal.
(1) Remove the choke assembly from the
135. Rotating Beacon Switch
a. Removal. Remove the rotating beacon
(2) Remove the choke assembly as
b. Cleaning and Inspection. Clean, inspect,
b. Cleaning and Inspection. Clean, inspect,
and replace a defective choke assembly.
and replace a defective rotating beacon switch.
c. Installation.
c. Installation.
Install the rotating beacon
(1) Install the choke assembly as
115