• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 76. Transfer case sending unit and speedometer drive gear, removal and installation
Figure 77. Turn signal control switch, removal and installation.

Maintenance Manual Snow Removal Unit, Self-Propelled: Gasoline Driven; Rotary; Wheel Mtd; Winterized Page Navigation
  104    105    106    107    108  109  110    111    112    113    114  
img
. . . . . . . . . . . . . . . . . . . . .
TM 5-3825-213-20
126. Turn Signal Control Switch
130. Fuel Tank Switch
a.  Removal.
a.  Removal. Remove the fuel tank switch as
(1) Remove the turn signal control switch
illustrated in figure 79.
b.  Cleaning and Inspection.  Clean, inspect,
as illustrated in figure 77.
(2) Remove the turn signal indicator lamp
and replace defective fuel tank switch assembly.
c.  Installation. Install the fuel tank switch as
as illustrated in figure 78.
b.  Cleaning and Inspection. Clean and inspect
illustrated in figure 79.
the turn signal control switch for improper operation and
damage. Inspect the lamp for lack of brilliance. Replace
131. Carrier Engine Ignition Switch
damaged or defective' parts.
a.  Removal.
Remove the carrier engine
c.  Installation.
ignition switch as illustrated in figure 79.
(1) Install the turn signal indicator lamp as
b.  Cleaning and Inspection.  Clean, inspect,
illustrated in figure 78.
and replace a defective ignition switch.
(2) Install the turn signal control switch as
c.  Installation.
Install the carrier engine
illustrated in figure 77.
ignition switch as illustrated in figure 79.
127. Carrier Engine Tachometer Assembly
132. Carrier Engine Coolant Temperature
a.  Removal.
Remove the carrier engine
Gage Assembly
tachometer assembly as illustrated in figure 79.
a.  Removal.
Remove the carrier engine
b.  Cleaning and Inspection. Clean and inspect
coolant temperature gage assembly as illustrated in
the tachometer assembly for restrictions or other
figure 79.
damage. Replace defective tachometer as necessary.
b.  Cleaning and Inspection.  Clean, inspect,
c.  Installation.
Install  the  tachometer
and replace a defective engine coolant temperature gage
assembly as illustrated in figure 79.
as necessary.
c.  Installation.
Install the carrier engine
128. Fuel Tank Gage Assembly
coolant temperature gage assembly as illustrated in
a.  Removal.  Remove the fuel tank gage
figure 79.
assembly as illustrated in figure 79.
b.  Cleaning and Inspection. Clean and inspect
133. Plow Engine Throttle Control Linkage
the fuel tank gage for broken lens, and damaged
a.  Removal.
housing and electrical terminals.
(1) Remove  throttle  control  from  the
c.  Installation.
Install the fuel tank gage
carburetor (par. 174).
assembly as illustrated in figure 79.
(2) Remove  the  plow  engine  throttle
control linkage as illustrated in figure
129. Air Pressure Gage Assembly
80.
a.  Removal. Remove the air pressure gage
assembly as illustrated in figure 79.
b.  Cleaning and Inspection.  Clean, inspect,
b.  Cleaning and Inspection.  Clean, inspect,
and replace a defective throttle control.
and replace a defective air pressure gage as necessary.
c.  Installation.
c.  Installation.  Install the air pressure gage
(1) Install the throttle control on the
assembly as illustrated in figure 79.
carburetor (par. 174).
(2) Install the plow engine throttle control
linkage as illustrated in figure 80.
114


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.