TM 5-3825-213-20
A
EMC 3825-213-20/54 (1)
A. Carrier cab roof panel and dome light removal points
Figure 54. Carrier cab roof panel, dome light, and horn, removal and installation.
Cleaning, Inspection, and Repair.
Cleaning, Inspection, and Repair.
c.
c.
(1) Clean all parts.
(1) Clean all parts.
(2) Inspect the clearance light assembly
(2) Inspect the marker light assembly for
for defective wiring, broken lens,
defective wiring, cracked or broken
cracks, or breaks.
lens, cracks or breaks.
(3) Replace or repair defective parts.
(3) Replace or repair defective parts.
d. Reassembly. Reassemble the clearance
d. Reassembly. Reassemble the marker light
e. Installation.
e. Installation.
Install the clearance light
Install the marker light
Note.
Remove the remaining
112. Rotating Beacon Light Assembly
clearance lights in a similar manner.
a. Removal. Remove the rotating beacon light
111. Marker Light Assembly
b. Disassembly.
Disassemble the rotating
a. Removal.
Remove the marker light
beacon light assembly as illustrated in figure 63.
b. Disassembly. Disassemble the marker light
89