• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 53. Alternator regulator voltage adjustment.
Figure 54. Carrier cab roof panel, dome light, and horn, removal and installation. - Continued

Maintenance Manual Snow Removal Unit, Self-Propelled: Gasoline Driven; Rotary; Wheel Mtd; Winterized Page Navigation
  79    80    81    82    83  84  85    86    87    88    89  
img
. . . . . . . .
TM 5-3825-213-20
A
EMC 3825-213-20/54 (1)
A. Carrier cab roof panel and dome light removal points
Figure 54. Carrier cab roof panel, dome light, and horn, removal and installation.
Cleaning, Inspection, and Repair.
Cleaning, Inspection, and Repair.
c.
c.
(1) Clean all parts.
(1) Clean all parts.
(2) Inspect the clearance light assembly
(2) Inspect the marker light assembly for
for defective wiring, broken lens,
defective wiring, cracked or broken
cracks, or breaks.
lens, cracks or breaks.
(3) Replace or repair defective parts.
(3) Replace or repair defective parts.
d.  Reassembly.  Reassemble the clearance
d.  Reassembly. Reassemble the marker light
light assembly as illustrated in figure 61.
assembly as illustrated in figure 62.
e. Installation.
e.  Installation.
Install the clearance light
Install  the  marker  light
assembly (fig. 57).
assembly (fig. 57).
Note.
Remove  the  remaining
112. Rotating Beacon Light Assembly
clearance lights in a similar manner.
a.  Removal. Remove the rotating beacon light
assembly as illustrated in figure 63.
111. Marker Light Assembly
b.  Disassembly.
Disassemble the rotating
a.  Removal.
Remove  the  marker  light
beacon light assembly as illustrated in figure 63.
assembly (fig. 57).
b.  Disassembly. Disassemble the marker light
assembly as illustrated in figure 62.
89


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.