• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 22. Auger assembly, removal and installation.
Figure 24. Chute trough assembly, removal and installation.

Maintenance Manual Snow Removal Unit, Self-Propelled: Gasoline Driven; Rotary; Wheel Mtd; Winterized Page Navigation
  40    41    42    43    44  45  46    47    48    49    50  
img
. . . .
TM 5-3825-213-20
Figure 23. Auger trunnion bearing
Section III. CHUTE ASSEMBLY
Cleaning, Inspection, and Repair.
c.
73. General
(1) Clean all parts in an approved cleaning
The plow chute assembly is mounted on a
solvent and dry thoroughly.
turntable above the fan blower housing. The chute is in
(2) Inspect the chute, turntable, and arms
three sections to permit the plowed snow to be expelled
for condition and broken welds.
the desired distance.
The chute is hydraulically
(3) Replace or repair defective parts as
controlled and can be turned to the right or left of the
necessary.
carrier.
d.  Reassembly.  Reassemble  the  chute
trough assembly as illustrated in figure 25.
74. Chute Trough Assembly
e.  Installation.
Install  the  chute  trough
a.  Removal.
Remove the chute trough
assembly as illustrated in figure 24.
assembly as illustrated in figure 24.
b.  Disassembly.
Disassemble the chute
trough assembly as illustrated in figure 25.
49


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.