TM 5-3825-213-35
16
Insulation washer
1
Screw, machine, 10-82 x 1/4 (3 rqr)
17
Union
2
Cover
18
Washer, seal
3
Screw, 10-32 x 3/8 (4 rqr)
19
Seal
4
Base
20
Gasket
5
Insulation
21
Screw, 8-32 x 5/8 (2 rqr)
6
Screw, machine, 10-32 x 2/8 in. (6 rqr)
22
Washer, flat, No. 8 (2 rqr)
7
Casing
23
Burner
8
Seal
24
Screw, machine, 10-32 x 3/4 in.
9
Grommet
25
Insulator
10
Nut, special (4 rqr)
26
Wire
11
27
Grommet
12
Nut, 10-32
28
Grommet
13
Washer, lock, ET, No. 10
29
Combustion chamber
14
Lead
15
Washer, flat, No. 10
Figure 9. Engine heater combustion chamber, disassembly and reassembly, exploded view.
(2) Install the igniter and cover (TM 5- 3825-
b. Installation. Install the heaters (TM 5- 3825-213-
213-20) .
20).
Section II. PERSONNEL HEATER
58. General
b. Fuel System. Fuel to operate the heater is
drawn from the carrier fuel tank through an electric fuel
a. Description. The personnel heater is an
pump and fuel filter to the electrically operated
electrically controlled, gasoline-operated heater. It is
regulating valve which controls the flow of fuel.
mounted on the plow clutch housing cover to the rear of
the carrier cab. The heater supplies heated fresh air to
c. Electrical System. The heater electrical system
the personnel cab, windshield defrosters, and battery
controls operation of the fuel and air
box.
46