TM 5-3825-213-35
Table IV. Time Standards-Continued
Removal and replacement
Man/Hours
0802.3
IDLER SHAFTS
(B)
Shafts, counter
(transfer out of unit-includes removal and installation of gears,
8.0
shafts, seals, and bearing)
0802.6
OUTPUT SHAFT; MAIN SHAFT
(B)
Shaft assembly, output
(transfer out of unit-inclvdes removal and installation of gears,
6.0
0803
CLUTCH
(B)
Clutch power transfer
(includes removal and installation of transfer case, drive shaft, and
8.0
clutch)
0803.1
CLUTCH CONTROLS
(B)
Controls, clutch
(includes removal and installation of controls and linkage)
6.0
0804
(B)
Shifter assembly
(includes removal and installation of control rods, shaft and yoke)
7.0
0806.7
VENTILATION, BREATHERS
(B)
Breather, ventilation
(includes removal and installation of breather)
0.5
09
PROPELLER SHAFT
0900
(B)
(includes removal and installation of drive shaft universal joint)
2.0
0903
(A)
Bearing assembly, drive shaft
(includes removal and installation of drive shaft, and pillow block)
1.0
10
FRONT AXLE
1000
FRONT AXLE ASSEMBLY
(B)
Axle assembly, front
(includes removal and installation of tires, wheels, cover, ball joints)
10.0
1001
HOUSING, BEAM, HOUSING COVERS, PLUGS
(B)
Beam, housing
(includes removal and installation of tires, wheels, axles, air lines,
13.0
steering, springs, and drive shaft)
1002
DIFFERENTIAL
Differential assembly
(includes removal and installation of wheels, axles, and drive
14.0
shafts)
Lock assembly, differential
(includes removal and installation of wheels, axles, gears, and seals)
15.0
Valve, lines
2.0
Power cluster
(includes removal and installation of lines, bracket, and power
3.0
cluster)
1004
STEERING
Steering assembly
(includes removal and installation of linkage and lines)
9.0
1005
VENTILATION
Breather
0.2
1006
SHAFT
Shafts
(includes removal and installation of drag link, bracket, arm
10.0
wheel, wiring, and cover plate)
18